Rehabilitation of Unit No.1 in Al-Musaib Power Station (300 MW),
which includes: Boiler, Turbine, generator & all auxiliaries (Pumps, valves, Heat exchanger, tanks, water treatment plant, pipe lines…etc). Also the maintenance for the Sub-Station (indoor & Outdoor) of the unit in (all the Unit Transformers, C.Bs & checking all cables and wiring diagrams).
-
Rehabilitation of Unit No.2 in Al-Musaib Power Station (300 MW) which includes: Boiler, Turbine, generator & all auxiliaries (Pumps, valves, Heat exchanger, tanks, water treatment plant, pipe lines…etc). Also the maintenance for the Sub-Station (indoor & Outdoor) of the unit i.e. (all the Unit Transformes, C.Bs & checking all cables and wiring diagrams). Also the replacement of all the local control instruments & control panels with all cables & wirings then install a new instrumentation equipments & control panels with new cabling and wiring.
-
Execution of 400KV transmission lines.
-
Rehabilitation the fourth unit of Baghdad South Power Station (55MW).
-
Rehabilitation of (3) 80 Ton/h water tube boilers replacement of about 39000m of bank tubes, riser tubes, economizer tubes headers …etc.
-
Rehabilitation a 5 Ton/h boiler.
-
Rehabilitation of about 20 hospitals boilers of different capacities.
-
Rehabilitation of water- pumps of Baghdad Municipal Office.
-
Rehabilitation of the boiler of Al-Rasheed Hotel.
-
Rehabilitation of the following items in the posts and concrete frames
factory:
• Reconditioning of three boilers, Designing and executing of the
relatives control panels. Erection
• Reconditioning of 3-over head cranes, a 60 cubic meters/hour concrete
patching plant, tubes and pumps located in the factory.
-
Rehabilitation of two boilers in Al-Qadisiya Company.
-
Manufacturing of 2 Ton/Hr boiler for Salfonic factory, 1996.
-
Manufacturing of (3) boilers 2 Ton/h each for three private soft drinks
factories, 1999.
-
Manufacturing of 5 Ton/h boiler for pre cast concrete factory, 2000.
-
Manufacturing of 1 Ton/h boiler for Golden tomato paste.
-
Manufacturing of 1 Ton/h boilers for Ibin-Yoanis Company.
-
Consulting and supervision for the rehabilitation of petrochemical
Company boiler in Basrah.
-
Supplying of many spare parts for boilers to Al-Faris Company.
-
Dismantling, transferring and re-constructing of 5 Ton/h boiler from Al-Rasheed
factory to Al-Ma’moon factory for the state company of vegetable oil
production.
-
Rehabilitation of boilers and turbines of thermal power units no.1,2,3
in Baghdad south power station also carrying out the maintenance for the
generators and automatic control & protection systems for these units.
-
Rehabilitation of boilers and turbines of thermal power units no.3 in
Dora power station.
-
A contract of complete assessment of 39 diesel generators of 2MW each
has been carried out by our technical staff in Mosul.
-
Baghdad co. has been recently awarded a contract of erecting, installing
and commissioning two gas units each 40MW in ALSAMAWA southern Iraq.
-
Dismantling 6 gas turbine frame 5 from Portugal and transferred to Dubai for rehabilitation and then transferred to be installed with another (2) used units and (8) new units fram (5).